We are one third of the way through the water meter replacement project with approximately 8,000 meters replaced so far. In November, our contractor Vanguard will continue working in neighborhoods located:
-south of Loop 820 and west of Rufe Snow Dr.
-south of Mid Cities Blvd. and east of Davis Blvd.
These areas are shown on the two maps below. If you live in one of these areas, you will receive a door hanger a few days before the installation of the new meter.
- Each Vanguard employee will wear a uniform with a visible company logo and their vehicle will be marked with the Vanguard logo.
- There will be a temporary service interruption when your water meter is replaced, but typically less than 30 minutes.
- Workers from Vanguard will do all of the work outside at your meter box near the curb and will not need to go inside your house. You will not need to be home when the meter replacement takes place.
After your meter has been replaced, you will have access to Eye on Water, which allows you to monitor your household’s daily water use. Go to www.eyeonwater.com or download the EyeOnWater app from the Apple App Store or Google Play Store to access your information. You will need the account number from your water bill to get started. Please note, it can take several days after your meter is replaced for your data to appear in the Eye On Water online portal and app.






